Line 10, Beijing Subway

Line 10
十号线

Statistics
Type Rapid transit
System Beijing Subway
Status Operational
Locale Beijing, China
Termini Bagou
Jinsong
No. of stations 22
Operation
Operator(s) Beijing Mass Transit Railway Operation Corp., Ltd
Depot(s) Bagou
Technical
Line length 24.68 km

Line 10 of the Beijing Subway (Chinese: 北京地铁10号线; pinyin: Běijīng Dìtiě Shí Hàoxiàn) is the second loop line in Beijing's rapid transit network.

Half of the Line 10 loop, north and east of the city centre, has been in operation since July 19, 2008. The other half of the loop, in the south and west, is now under construction. In the north, south and west, the Line 10 loop is situated in between the city's Third and Fourth Ring Roads. In the east, Line 10 runs underneath the eastern Third Ring Road. When Line 10 is fully completed on September 30, 2013, it will form a second concentric ring around the Line 2 loop.[1] The full Line 10 loop will have 45 stations in all, with 24 transfer points to other subway and suburban rail lines.[2] Line 10's color is      light blue.

Contents

Fare

Flat fare of RMB(¥) 2.00 with unlimited transfers.

Hours of Operation

The first east-bound trains departs from Bagou at 5:05am. The first north-bound train departs from Jinsong at 5:53am . The last east-bound train leaves Bagou at 10:25pm. The last north-bound train leaves Jinsong at 11:13pm. For the official timetable, see[1].

Route and Stations

Phase I route

Phase I of Line 10 now in operation is an inverted "L"-shaped line that runs to the north and east of the city. It is 24.68 km in length with 22 stations. In the north, it begins in Bagou near Wanliu Park in Haidian District and runs straight east, between the northern 3rd and 4th Ring Roads. At Xitucheng, the line meets the northern section of the Yuan dynasty earthen city wall, called tucheng. The Jiandemen and Anzhenmen stops are named after former gates in the wall. At Beitucheng, Olympic Branch Line extends off Line 10 and provides access to the Beijing Olympic Green. Farther east, Line 10 turns south after the Sanyuanqiao and follows the eastern 3rd Ring Road straight south to Jinsong in Chaoyang District. The line connects the university district in Haidian with the embassy district and Beijing CBD. Construction on Phase I began in December 2003 and was completed by the end of June 2008. A trip from Bagou to Jinsong takes about 40 minutes. Line 10 stations, from the northwest to the southeast (with transfer points):

Station
Name
Chinese
pinyin
Travel
Time
(hrs)
Distance
(km)
Transfers Nearby Bus Stops* Location
(District)
Bagou 巴沟
bāgōu
0:00 0.0 302, 304, 307, 323, 361, 362, 367 374, 386, 394, 630, 664, 704, 851 Haidian
Suzhoujie
Suzhou St.
苏州街
sūzhōujīe
0:01 26, 302, 304, 361, 367, 394, 630, 671, 851, 944
Haidian Huangzhuang 海淀黄庄
hǎidiàn huángzhuāng
0:03  Line 4  302, 320, 304, 332, 355, 386, 630, 653, 671, 697, 717, 718, 731, 801, 861, 944
Zhichunli 知春里
zhīchūnlǐ
0:05 304, 323, 386, 630, 653, 671, 689, 826, 851
Zhichunlu
Zhichun Rd.
知春路
zhīchūnlù
0:07  Line 13  304, 386, 604, 641, 653, 671, 826, 851, 944
Xitucheng
West Tucheng
西土城
xītǔchéng
0:09 21, 304, 323快, 375, 392, 398, 490, 498, 604, 641, 653, 671, 691, 826, 836, 851,
Mudanyuan 牡丹园
mǔdānyuán
0:11 16, 21, 22, 38, 47, 304, 331, 425, 510, 618, 635, 641, 653, 689, 690, 826, 851,
Jiandemen
Jiande Gate
建德门
jiàndémén
0:13 21, 55, 305, 315, 345, 407, 510, 618, 625, 641, 645, 653, 670, 695, 849, 909, 939 Haidian /
Chaoyang
[note 1]
Beitucheng
North Tucheng
北土城
běitǔchéng
0:15  Line 8  21, 113, 380, 407, 409, 645, 653, 694, 839, 849. 特2 Chaoyang
Anzhenmen
Anzhen Gate
安贞门
ānzhēnmén
0:17 18, 108, 124, 328, 358, 380, 387, 409, 426, 430, 643 653, 758, 849, 850, 858, 985, 运通104
Huixinxijie Nankou 惠新西街南口
hùixīnxījiē nánkǒu
0:19  Line 5  19, 101, 125, 464
Shaoyaoju 芍药居
sháoyàojū
0:22  Line 13  515, 606
Taiyanggong 太阳宫
tàiyanggōng
0:24 467, 515, 623, 966
Sanyuanqiao 三元桥
sānyuánqiáo
0:27  Airport  359, 401, 404, 614, 915, 916, 936支, 954, 967, 970
Liangmaqiao 亮马桥
liàngmǎqiáo
0:29 402, 405, 413, 418, 419, 420, 421, 499, 503, 516, 627, 671, 672, 675, 688, 701, 707, 718, 801, 909, 955, 984, 985, 运通107, 特3
Agricultural Exhibition Center 农业展览馆
nóngyè zhǎnlǎnguǎn
0:31 302, 402, 405, 420, 421, 499, 516, 627, 635, 671, 675, 701, 707, 731, 718, 运通107, 特3
Tuanjiehu 团结湖
tuánjiéhú
0:33 113, 115, 117, 350, 406, 431, 416环, 686, 701, 750, 758, 特3
Hujialou 呼家楼
hūjiālóu
0:35 113, 126, 350, 402, 405, 420, 421, 440, 627, 671, 707, 750, 858, 特3
Jintaixizhao 金台夕照
jīntái xīzhào
0:37 9, 113, 402, 405, 488, 421, 686, 707, 729, 801, 974, 运通107, 特3, 特8内
Guomao
China World Trade Center
国贸
guómào
0:38  Line 1  1, 9, 28, 37, 48, 57, 113, 348 402, 405, 421, 728, 729, 801, 802, 808, 810, 975, 976
Shuangjing 双井
shuāngjǐng āndìmén
0:41 28, 35, 37, 57, 300, 457, 627, 637, 683, 686, 707, 715, 802, 954, 974, 976, 运通107, 特3, 特8内
Jinsong 劲松
jìnsōng
0:42 28, 29, 35, 37, 41, 52, 352, 457, 637, 638, 686, 683, 707, 802, 974, 特3, 特8
Beitucheng Station Mudanyuan station Station sign showing Exits
A, B & D of Zhichunli Station

Phase II route

Phase II of Line 10 across the south and west of the city is 32.45 km in length with 23 stations. Construction on Phase II began on December 9, 2007 and is scheduled to be completed on September 30, 2013.[1] Phase II stations from southeast to northwest:[3]

Technology

Signaling system

For metro line 10, Siemens Transportation Systems and China Railway Signaling & Communication Corp. have equipped the line with ETCS Level 3 technology. As a fallback level the ETCS Level 1 is available.[4]

Safety

There are subway public security bureaus (police stations) located in the Bagou, Beitucheng and Liangmaqiao stations.[5] To report emergencies, call 110 or 64011327.

Notes

  1. ^ The Jiandemen Station straddles the border between Haidian and Chaoyang Districts.

External links

References

  1. ^ a b (Chinese) 北京地铁10号线二期12月28日开工 京华时报 Nov. 4, 2008
  2. ^ 北京地铁10号线串起17条地铁 全线设24座换乘站 搜狐2008奥运
  3. ^ (Chinese) Line 10 Phase II page last accessed July 30, 2009
  4. ^ "Metro Line 10 (Olympic Line), Wanliu - Jinsong, Beijing". Siemens AG. http://references.transportation.siemens.com/refdb/showReference.do?r=2063&div=2&div=2&div=2&l=en. Retrieved 2008-07-06. 
  5. ^ (Chinese) "北京地铁地铁10号线三个派出所正式挂牌办公". 竞报. July 20, 2008. http://2008.sina.com.cn/dt/other/2008-07-20/1548115630.shtml. Retrieved 2008-07-22.